WestConnex MOC5 Complex Building Construction

OVERVIEW

​

To ensure the safety of the community, workers and road users, WestConnex designed a central Motorway Control Centre (MCC) where motorways are monitored and managed 24-hrs a day. The MCC would be the central building for all communications and control of the project’s operational management control systems, and was constructed within the Burrows Road motorway operations complex. 

​

Damcon was the preferred subcontractor to carry out the FRP works for the new multi-million-dollar centre. The project involved the construction of 3,000 square meters of suspended slab 5.20-meter-high from the ground using a propriety formwork system, eliminating the need for erecting catch decks for safety purposes in comparison to using conventional formwork. Concrete pours were administered into 2 separate areas and were conducted out of hours to minimise disruption to commuters.​


SCOPE OF WORK

​

  • Concrete Freestanding columns and Walls

  • Construction of a 2 level Lift shaft

  • Ground Level slab

  • First floor Level suspended Slab

  • Mezzanine Level Slab

  • Upstand Walls

  • Stair shaft Walls

  • Cast in-situ Stairs x 3

  • Pavements

 

All concrete quality as per RMS QA specification B80.

PROJECT

WestConnex MO5 Complex

Building Structure

CLIENT

Degnan Constructions

SECTOR

Building

STATUS

Completed

DURATION

June 2019 - October 2019